PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing split wire above the cealing at the 2nd floor Facing West (800x600).jpg Main Sprinkler piping at the 1st Floor Facing North-East (800x600).jpg Metal Track (800x600).jpg Poured slab on deck at half of the 4th Floor Facing North-West (800x600).jpg Pouring concrete at half of the 4th Floor Facing North-West (800x600).jpg Welding beam clips at the 3rd Floor Facing East (800x600).jpg
Previous pageNext page Pouring concrete at half of the 4th Floor Facing North-West (800x600)
Pouring concrete at half of the 4th Floor Facing North-West (800x600)